CASE STUDIES

Bloomberg UK HQ

Coreshield’s involvement with Sir Robert Mc Alpine construction on this prestigious project is testimony to our capabilities. Following a short brief from the electrical consultants who recognised that an element of passive protection was required to screen some areas from what would be higher than acceptable stray electromagnetic fields generated from a large transformer and switch room.

Key Points

Product system:

50hz-icon-2

Source of induction:

Transformer
Switchgear
HV/LV Cables

Mitigation target:

ambient-1

Main contractor:

mcalpine-edit

Project Overview

Sophisticated computer modelling was used to simulate maximum loads in the plant room, providing a graphic overview with isolines showing the extent of the stray fields.

To achieve a smooth project completion Coreshield worked closely with the other contractors involved in the delivery of the particular area to ensure a fully coordinated design outcome.

Coreshield developed a unique layered screening system specifically for this project which enabled the support of top hung services and the movement of heavy plant at ground level.

We installed a six sided homogenous screen removing any potential risk of problems from stray EMF.

The installation was a resounding success, confirmed by operational site measurements, test and certification.