Key Points
Project Overview
Sophisticated computer modelling was used to simulate maximum loads in the plant room, providing a graphic overview with isolines showing the extent of the stray fields.
To achieve a smooth project completion Coreshield worked closely with the other contractors involved in the delivery of the particular area to ensure a fully coordinated design outcome.
Coreshield developed a unique layered screening system specifically for this project which enabled the support of top hung services and the movement of heavy plant at ground level.
We installed a six sided homogenous screen removing any potential risk of problems from stray EMF.
The installation was a resounding success, confirmed by operational site measurements, test and certification.